What this guide covers
Core Trades is about 30 percent of the B exam, and plumbing is its largest slice. Most test one number or one sequence from the California Plumbing Code. How far a trap may sit from its vent. How deep a seal is. How a shower is sized and tested. How supply and drain piping are tested. Where the water heater straps go. This guide carries those figures at the grain the exam tests them.
Key terms
- Trap arm
- The pipe between a fixture trap's weir and the vent that protects it.
- Circuit vent
- One vent serving up to eight floor-outlet fixtures on a horizontal branch, connected between the two most upstream trap arms.
- Authority Having Jurisdiction (AHJ)
- The building department or official that enforces the code and can require more.
The rules the exam tests
5 rules · 2 minDefinitions and traps
Two feet outside the building wall, the ends and the building sewer begins.
The building drain is the lowest piping of a drainage system. It receives discharge from the soil, waste, and other drainage pipes inside the building's walls and carries it to the building sewer, which begins 2 feet outside the wall.
On the job
The exam tests the handoff: building drain to building sewer, and the line between them sits 2 feet outside the wall. The drain's last 2 feet are outside the building.
Exact wording
The building drain is the lowest piping of a drainage system. It receives the discharge from the soil, waste, and other drainage pipes inside the building's walls and carries it to the building sewer, which begins 2 feet outside the building wall.
Plumbing Code § 204.0
A starts above the highest horizontal drain. The roof is not the start.
A is the vertical main of soil, waste, or vent piping that runs through one or more stories. Only a soil or waste stack has a stack vent: the part above the highest horizontal drain connected to that stack.
On the job
The exam tests where a stack vent begins: above the highest horizontal drain, not at the roof. The definition is the whole fact.
Exact wording
A stack is the vertical main of soil, waste, or vent piping that runs through one or more stories. A stack vent is the extension of a soil or waste stack above the highest horizontal drain connected to that stack.
Plumbing Code § 221.0
Keep your trap arm at least two pipe diameters long and within the Table 1002.2 maximum.
Every fixture trap needs a protecting vent. Measure from the trap weir to the inner edge of the vent: never less than two pipe diameters, and never more than Table 1002.2 — 30 inches on 1-1/4-inch pipe, 42 on 1-1/2, 60 on 2, 72 on 3, and 120 on 4-inch and larger. Slope trap arms 1/4 inch per foot. The distance from a water closet's trap to its vent, measured from the face of the flange, may not exceed 6 feet. On a horizontal wet vent, tubs and showers are limited to 6 feet on 1-1/2-inch drains and 8 feet on 2-inch drains.
On the job
The tested idea is that the trap arm's size sets the distance to the vent. The trap: there is a minimum too, two diameters. A vent can be too close as well as too far.
Exact wording
Every fixture trap has a protecting vent. The trap arm's developed length, from the trap weir to the inner edge of the vent, may not exceed Table 1002.2 for its pipe size, and may never be less than two pipe diameters. The maximums are 30 inches for 1-1/4-inch pipe, 42 for 1-1/2, 60 for 2, 72 for 3, and 120 for 4 inches and larger. Trap arms keep a 1/4-inch-per-foot slope. A water closet's trap-to-vent length, from the face of the flange, may not exceed 6 feet. Horizontally wet-vented tubs and showers are limited to 6 feet for 1-1/2-inch drains and 8 feet for 2-inch drains.
Plumbing Code § 1002.2
The is the vertical distance between the top dip and the crown weir.
The top dip is the highest point of the trap's inside bend at the bottom, and the crown weir is the lowest point of the horizontal waterway where it leaves the trap. The water held between them blocks sewer gas.
On the job
The exam tests the definition as a picture: seal depth is measured from the top dip up to the crown weir. Section 1005.1 then puts numbers on it.
Exact wording
A trap seal is the vertical distance between the crown weir and the top dip of the trap. The crown weir is the lowest point of the horizontal waterway where it leaves the trap; the top dip is the highest point of the trap's inside bend at the bottom. The water held between them is what blocks sewer gas.
Plumbing Code § 222.0
Keep every trap seal at least 2 inches deep and no more than 4 inches.
Every fixture trap must hold a liquid seal at least 2 inches deep and no more than 4 inches. Only the AHJ can require a deeper seal. Set traps true to their seals, and protect them from freezing where needed.
On the job
The 2-inch minimum is the tested number. The 4-inch maximum is the neighbor that catches a learner who thinks deeper is always better. The seal is what blocks sewer gas.
Exact wording
Each fixture trap holds a liquid seal of at least 2 inches and not more than 4 inches, unless the Authority Having Jurisdiction finds a deeper seal necessary. Traps are set true to their liquid seals and protected from freezing where necessary.
Plumbing Code § 1005.1
Take away
2 rules · 1 minFixtures
Give every shower compartment at least 1,024 square inches and room for a 30-inch circle.
Measure the finished interior at the top of the threshold, and keep both the 1,024 square inches and the 30-inch circle clear to 70 inches above the drain outlet. Only valves, showerheads, soap dishes, shelves, and grab bars may protrude into that space. Fold-down seats in accessible showers may enter the circle. Two exceptions: showers built to Chapter 11A of the Building Code, and receptors at least 30 inches wide and 60 inches long.
On the job
1,024 square inches and the 30-inch circle are the tested pair. The 30-by-60 receptor exception is the qualifier a question hides in the answer choices.
Exact wording
A shower compartment's finished interior must be at least 1,024 square inches and able to hold a 30-inch circle. The size is measured at the top of the threshold and held to 70 inches above the drain outlet, with only valves, showerheads, soap dishes, shelves, and grab bars allowed to protrude. Fold-down seats in accessible showers may enter the circle. Two exceptions: showers built to Chapter 11A of the Building Code, and receptors at least 30 inches wide and 60 inches long.
Plumbing Code § 408.7
Test a shower receptor with standing water for at least 15 minutes.
Fill the receptor at least 2 inches deep and leave the water at least 15 minutes. Where there is no threshold, build a temporary 2-inch barrier for the test. Place the test plug so both the upper and under sides of the subpan are tested at the drain clamp.
On the job
The tested figures are 2 inches of water for 15 minutes. Where there is no threshold a temporary 2-inch barrier is built. The plug is set so both sides of the subpan at the drain clamp see the test.
Exact wording
A shower receptor is tested for watertightness by filling it with water at least 2 inches deep for at least 15 minutes. Where there is no threshold, a temporary 2-inch barrier is built for the test. The test plug is placed so that both the upper and under sides of the subpan take the test where it clamps to the drain.
Plumbing Code § 408.8.5
Take away
3 rules · 2 minDrain, waste, and vent
Prime every PVC joint with purple primer before you apply the cement.
A PVC solvent-cement joint starts clean and dry: cut the pipe square, deburr it, and clean the pipe and the fitting of dirt, moisture, oil, and foreign material. Brush purple primer complying with ASTM F656 on the pipe and fitting surfaces until those surfaces soften, then apply solvent cement complying with ASTM D2564 to all joint surfaces and make the joint while both the socket and the pipe are still wet with cement. Hold the joint in place, undisturbed, for 1 minute after assembly. Under the HCD provisions, the primer and the cement are low-VOC products.
On the job
The tested sequence is primer before cement: purple primer until the surfaces soften, then cement on every joint surface, with the joint made while both surfaces are wet with cement. Skipping the primer is the wrong answer the exam offers.
Exact wording
PVC solvent-cement joints start clean and dry: cut the pipe square, deburr it, and clean both surfaces of dirt, moisture, oil, and foreign material. Apply purple primer complying with ASTM F656 to the pipe and fitting surfaces until they soften. Apply solvent cement complying with ASTM D2564 to all joint surfaces, and make the joint while both the socket and the pipe are still wet with cement. Hold the joint in place, undisturbed, for 1 minute after assembly. Under the HCD provisions, primer and cement are low-VOC products.
Plumbing Code § 705.6.2
You may circuit vent up to eight floor-outlet fixtures on one horizontal branch.
On a circuit-vented horizontal branch, the pipe counts as both a drain and a vent from the most downstream trap arm to the most upstream one. Up to eight fixtures may share that branch: floor-outlet water closets, showers, bathtubs, or floor drains. Connect each trap arm horizontally to the branch, within the trap-arm table's limits. Back-outlet and wall-hung water closets may be circuit vented only where no floor-outlet fixture shares the branch.
On the job
The exam tests what a circuit vent is: one vent serving a battery of fixtures on a horizontal branch. Eight is the ceiling, and the branch itself does double duty as the vent.
Exact wording
Up to eight floor-outlet water closets, showers, bathtubs, or floor drains on one horizontal branch may be circuit vented. Each trap arm connects horizontally to the branch, within the trap-arm table's limits. From the most downstream trap arm to the most upstream one, the branch counts as both a drain and a vent. Back-outlet and wall-hung water closets may be circuit vented only where no floor-outlet fixture shares the branch.
Plumbing Code § 911.1
Never size a circuit vent smaller than 2 inches.
Size a circuit vent from Table 703.2 by the number of circuit-vented fixtures on the branch, and 2 inches is the minimum. Connect it to the horizontal branch on the vertical, between the two most upstream trap arms, and never let it receive soil or waste. Where circuit vents interconnect, size each one on its own and size the pipe joining them from Table 703.2.
On the job
Two tested details: the 2-inch floor, and the connection point between the two most upstream trap arms. A circuit vent that carries waste is not a vent.
Exact wording
A circuit vent is sized from Table 703.2 by the number of circuit-vented fixtures on the branch, but is never smaller than 2 inches. It connects to the horizontal branch on the vertical, between the two most upstream trap arms, and it may not receive any soil or waste. Where several circuit vents are interconnected, each is sized on its own and the pipe joining them is sized from Table 703.2.
Plumbing Code § 911.2
Take away
5 rules · 3 minWater supply and protection
When a system has a chemical injector, you protect the potable supply with an .
Two things trigger the requirement: an actual chemical injector, or only the provisions for chemical injection, such as piping roughed in for a future one. In either case you protect the potable water supply with a reduced-pressure principle assembly (RP).
On the job
The exam tests which backflow device a fertilizer or chemical injector demands. The answer is the RP, the high-hazard assembly the code names for a chemical injector, not a double-check or a vacuum breaker.
Exact wording
Where a system includes a chemical injector, or provisions for chemical injection, the potable water supply is protected by a reduced-pressure principle backflow prevention assembly, an RP.
Plumbing Code § 603.5.6.3
Run the T&P discharge pipe full size with no valve. Never end it in the pan.
Size the discharge pipe at least as large as the valve outlet, and keep out any obstruction or means of isolation. Point it down and carry it to the of the area receiving it. Use material rated for the system's operating temperature, or material that complies with ASME A112.4.1. Discharge by gravity through an into the drainage system, or outside the building with the end pointing down, 6 inches to 2 feet above the ground. Never trap the pipe, thread its end, let it freeze, run it into the water heater pan, or let it cause injury or structural damage. End it where it is readily observable.
On the job
Full size and no valve are the tested facts. The eight conditions are the neighbors. The pan prohibition and the 6-inch-to-2-foot termination are the ones the exam turns into wrong answers.
Exact wording
The discharge pipe from a temperature or pressure relief valve has no valves, obstructions, or means of isolation. It is at least the size of the valve outlet and discharges full size, pointing down, to the flood level of the area receiving it. Its material is rated for the system's operating temperature or complies with ASME A112.4.1. It discharges by gravity through an air gap into the drainage system, or outside the building with the end between 6 inches and 2 feet above the ground, pointing down. It may not cause injury or structural damage, may not be trapped or subject to freezing, may not have a threaded end, may not discharge into the water heater pan, and must end where it is readily observable.
Plumbing Code § 608.5
Test the completed water supply with water or air. Plastic pipe is tested with water.
You can test a finished section or the whole hot and cold system. Water test: at or above the working pressure. Air test: at least 50 psi. Never air-test plastic, except PEX, PP, or PE-RT where the manufacturer's instructions permit it. Hold the test pressure with no evidence of leakage for at least 15 minutes.
On the job
The exam asks how CPVC supply piping is tested. Water, not air: plastic is never air-tested unless it is PEX, PP, or PE-RT with the manufacturer's blessing. The 50 psi and 15 minutes are the neighbors.
Exact wording
When a section or the whole hot and cold water supply is complete, it is tested with water or air. A water test is at or above the working pressure; an air test is at least 50 psi. Plastic pipe is not tested with air, except PEX, PP, or PE-RT tube where the manufacturer's instructions permit it. The system must hold the test pressure with no evidence of leakage for at least 15 minutes.
Plumbing Code § 609.4
When the AHJ requires it, disinfect new or repaired potable water piping with chlorine before use.
Unless the health authority prescribes a method, use the code's method on that piping: flush with clean potable water until it appears at the outlets; fill with a chlorine solution of at least 50 parts per million and let it stand 24 hours, or at least 200 parts per million for 3 hours; then flush until the chlorine residual matches the flushing water. Repeat the whole procedure if a bacteriological examination shows contamination.
On the job
The general rule is disinfection before use WHEN the Authority Having Jurisdiction requires it. If no health-authority method is prescribed, the code supplies the chlorine procedure. The two doses are a memorable pair: more chlorine, less time.
Exact wording
New or repaired potable water piping is disinfected before use where the Authority Having Jurisdiction requires it. Unless the health authority prescribes a method, the code's is: flush with clean potable water until it appears at the outlets; fill with a chlorine solution of at least 50 parts per million and let it stand 24 hours, or at least 200 parts per million for 3 hours; then flush until the chlorine residual matches the flushing water. The procedure is repeated where a bacteriological examination shows contamination.
Plumbing Code § 609.10
Anchor or strap new, replacement, and existing residential water heaters within the upper and lower thirds.
Anchoring or strapping must resist horizontal displacement in an earthquake, and you measure those thirds on the heater's height. At the lower point, keep the strap at least 4 inches above the controls. Health and Safety Code Section 19211(a) applies this duty to all new and replacement water heaters, and to all existing residential water heaters.
On the job
Upper third and lower third are the tested locations; the 4 inches above the controls is the neighbor.
Exact wording
Water heaters are anchored or strapped to resist horizontal displacement in an earthquake. Strapping goes at points within the upper third and the lower third of the heater's height. At the lower point, the strap stays at least 4 inches above the controls. Health and Safety Code Section 19211(a) applies the duty to all new and replacement water heaters, and to all existing residential water heaters.
Plumbing Code § 507.2
Take away
2 rules · 1 minTesting and inspection
You test plumbing, drainage, and vent piping with water or air. Never air-test plastic pipe.
The AHJ may require you to remove cleanouts and similar fittings to confirm the pressure reached every part of the system. After the fixtures are set and their traps are filled with water, you run the final test.
On the job
Two tested sequences live here. The rough piping is tested with water or air, and plastic is never air-tested. The final test comes after fixtures are set with traps filled.
Exact wording
Plumbing, drainage, and venting piping is tested with water or air, except that plastic pipe is not tested with air. The Authority Having Jurisdiction may require cleanouts and similar fittings removed to confirm the pressure reached every part of the system. After the fixtures are set and their traps filled with water, the system is submitted to a final test.
Plumbing Code § 712.1
Test no section of the drainage and vent system with less than a 10-foot head.
You may test the whole drainage and vent system at once or in sections. For the whole system, close every opening tight except the highest and fill to overflow. For a section, plug every opening except that section's highest and fill the section. Each next section includes at least the upper 10 feet of the section before it, so every joint except the system's top 10 feet sees a 10-foot head. Keep the water in at least 15 minutes before inspection starts, and the system must be tight at all points.
On the job
The 10-foot head is the tested number and the reason a section test overlaps the one before it. Fifteen minutes is the neighbor the exam pairs with it.
Exact wording
The water test covers the drainage and vent system as a whole or in sections. For the whole system, every opening but the highest is closed tight and the system is filled to overflow. In sections, every opening but the section's highest is plugged and the section is filled, and no section is tested with less than a 10-foot head of water. Each successive section includes at least the upper 10 feet of the section before it, so every joint except the top 10 feet of the system sees a 10-foot head. The water stays in for at least 15 minutes before inspection starts, and the system must be tight at all points.
Plumbing Code § 712.2
Take away
2 rules · 1 minPlumbing arithmetic
Every foot up costs you pressure before friction is even counted.
Water pressure changes 0.433 psi for every foot of elevation. Lifting water to a fixture costs 0.433 × its height in feet, and the fixture gets the supply pressure minus that loss, before friction. Example: a fixture 30 feet above the meter loses 30 × 0.433 = 12.99, about 13 psi.
On the job
The exam gives a height and asks for the pressure lost. Or it gives a supply pressure and a height and asks what reaches the fixture.
Exact wording
Water pressure changes 0.433 psi for every foot of elevation. The pressure lost lifting water to a fixture is 0.433 times the height in feet, and the pressure at the fixture is the supply pressure minus that loss, before friction. Example: a fixture 30 feet above the meter loses 30 × 0.433 = 12.99, about 13 psi.
Standard trade practice
Calculate the fall from the slope. Add it to the starting depth only on level ground.
Fall is the drop over the run: slope in inches per foot times the run in feet. A drain's is the pipe's inside bottom. Only where the ground is level along the run does the far end's depth below grade equal the starting depth plus the fall. On level ground: a drain 18 inches down at 1/4 inch per foot over 80 feet falls 0.25 x 80 = 20 inches, landing 38 inches down.
On the job
The exam gives a starting depth, a slope, and a run, and asks how deep the far end lands. Check the stem for level ground: the slope sets the fall, and the ground sets the depth. Where the grade changes, you need its elevation at the far end too.
Exact wording
A drain's invert is the inside bottom of the pipe. Slope gives the FALL, not the depth: fall in inches equals the slope in inches per foot times the run in feet. Only where the ground is level along the run does the far end's depth below grade equal the starting depth plus the fall. Example on level ground: a drain 18 inches down at 1/4 inch per foot over 80 feet falls 0.25 × 80 = 20 inches, to 38 inches down.
Standard trade practice
Take away
Important numbers to know
Where people go wrong
Sounds right: "The closer the vent to the trap, the better."
Where’s the catch?
Sounds right: "Plastic supply pipe can be air-tested at 50 psi like anything else."
Where’s the catch?
Sounds right: "The T&P discharge can run into the water heater pan."
Where’s the catch?
Sounds right: "A 30-by-60 shower receptor still needs 1,024 square inches and the 30-inch circle."
Where’s the catch?
Sounds right: "A circuit vent connects at the downstream end of the branch."
Where’s the catch?
Sounds right: "The final DWV test happens before the fixtures go in."
Where’s the catch?
Where to look it up
- Plumbing terms (stack, stack vent, trap arm)
- CPC Chapter 2, alphabetical by section — 221.0 holds the S terms
- Shower size and receptor tests
- CPC Chapter 4, Section 408 (408.7 size, 408.8.5 test)
- Water heater strapping; relief-valve discharge
- CPC 507.2 (Chapter 5); 608.5 (Chapter 6)
- Backflow, supply testing, disinfection
- CPC Chapter 6: 603.5.6.3, 609.4, 609.10
- DWV tests
- CPC Chapter 7, Section 712: 712.1 media and final test, 712.2 water test
- Vents and traps
- CPC Chapter 9 (911 circuit vents); Chapter 10 (1002.2 trap arms, 1005.1 seals)
Glossary
Every term this guide defines, in one place. Each is also defined where it first appears.
- Air gap
- An open vertical space between a discharge pipe's end and the flood level of what receives it.
- Building drain
- The lowest drainage piping inside the building; it hands off to the building sewer 2 feet outside the wall.
- Developed length
- Length measured along the centerline of the pipe and fittings, not in a straight line.
- Flood level
- The level at which water would overflow a fixture or receptor.
- Invert
- The inside bottom of a drain pipe; the elevation drains are measured from.
- Reduced-pressure principle assembly (RP)
- The backflow preventer required where chemicals can be injected into a water system.
- Stack
- The vertical main of soil, waste, or vent piping running through one or more stories.
- Stack vent
- The extension of a soil or waste stack above the highest horizontal drain connected to it.
- Temperature and pressure relief valve (T&P)
- The water heater's safety valve; its discharge pipe runs full size with no valve.
- Trap seal
- The vertical distance from the trap's top dip to its crown weir; the water held there blocks sewer gas. 2 to 4 inches deep.
Keep going
- Practice questions for General Building (B) — Core Trades is 30% of the exam.
- Job scenario: Six Circuits and a Closet
- Job scenario: The Closet Heater
- Also in Core Trades: Core Trades: Seven Trades, One Section
- Also in Core Trades: HVAC: The Rules the Exam Asks For
- Also in Core Trades: Electrical: The Rules the Exam Asks For
- Also in Core Trades: Building Envelope: The Rules the Exam Asks For
- Every number on one page — this guide’s figures alongside every other General Building (B) guide’s.
Test yourself: 9 questions for this guide
A paid account adds more ways to practice and prepare: study questions after every chapter, practice questions for every topic, timed practice exams, and job scenarios drawn from real jobs. A free account gets you one timed practice exam and saves your progress across devices. Here is one of this guide's questions:
A 2-inch trap arm: how far may the trap be from its vent, and how close?
AnswerNo more than 60 inches of developed length, and no less than two pipe diameters (4 inches).
Plumbing Code § 1002.2